Planning requirement decision or deviation decision
Показать связи →In certain situations, applying for a building permit may require a planning requirement decision or a deviation decision.
Издатель: City of Rauma · Муниципалитет
Язык описания: Английский
Охват: Выбранные муниципалитеты, регионы или округа благополучия
Об услуге
Описание
Before applying for the actual building permit, a planning requirement decision must be applied for when the construction is located in the area where planning is required. A planning area refers to an area where there is a need for community construction due to existing building stock or construction pressure. The use of the area requires special measures, such as the construction of roads, water pipes or sewers or the organisation of free zones. As a rule, such arrangements are planned in the local detailed plan. Provisions on planning needs are also applied to construction with significant environmental impacts. The granting of a building permit in a planning needs area for which no local detailed plan has been approved requires the fulfilment of special conditions, which are examined in the planning needs solution before the actual building permit matter is processed. Whether the project requires a planning requirement decision is considered on a case-by-case basis. The solution is influenced by the building stock in the area, its quality and extent, the size and location of the construction project and the common needs related to the use of the area. In the planning requirement area, it is permitted to repair a building without a planning requirement decision, to expand a residential building slightly or to build a household building belonging to an existing apartment or farm. An application for a planning requirement decision is submitted to building supervision. The most common appendices required for the application are: • Planning Requirement DecisionApplication Form in one copy • Power of Attorney to sign the application if the applicant does not sign the application • account of the applicant's possession of the plot or building site (title, lease, etc.) • official map set for planning requirement decision • construction plans (in four series) • report on informing neighbours The planning requirement decision is valid for the period specified in the decision, which may not exceed two years. During the period of validity of the planning requirement decision, a permit for the actual construction must be applied for.